JADMAH MINE

Around 950,000 tons of Gold ore & Waste was mined by utilising generally 64mm TDH blast holes on benches varying 3 to 5 meters utilising a PF of 0.35 to 0.5 to get the ROM feed for the crusher for further processing of the gold ore with high silver content, which calls for a very delicate mining of benches to control the dilution. Waste was disposed to the designated waste dump managed as per the scope & ore was transported to ROM crusher pad sometime fed directly, Ore body being located in the Gosanic Structure posed challenges in maintaining the slope stability which was very methodically handled to achieve the accident free execution of contract including the environmental control to the scope. The contract was accomplished well within the given timeframe.

  • Client

    Saudi Arabian Mining Company

  • Service Provided

    Mining and Transpotation